Contact Us

Shandong Aonuo New Material Co,.Ltd

Add: Guangrao County, Dongying City, Shandong, P.R.China

Tel:+86-546-6660612

Fax:+86-546-6660279

Ph:+8613287307852

E-mail:info@aonuochina.cn

Construction process of Hand Brush Polyurea

- Oct 24, 2018 -

Construction process of Hand Brush Polyurea

手涂聚脲1

Application

The hand brush Polyurea coating is mainly used in the occasions where it is not easy to use the spraying machine.

Construction process

1. Remove the cement slurry and loose impurities on the concrete substrate. The metal should be sandblasted and rusted. Make sure the bottom material is clean before construction, avoid oil and impurities, and avoid water on the substrate.

2. Brush the matching primer.

3. Spray the hand brush polyurea coating within 48 hours after the primer is dry.

Related Industry Knowledge

Related Products

  • Spray Polyurea Waterproofing Polyurea Coatings For Water Park
  • Speaker Box Use Polyurea Coatings
  • High Speed Railway Polyurea Protective Coating
  • Anticorrosion Polyurea Coating For Tunnel
  • Power Heat Resistant And Heavy Duty Polyurea Material
  • Anticorrosion Waterproof One Component Polyurea Protective Coating Specifically For Urban Overpass