Contact Us

Shandong Aonuo New Material Co,.Ltd

Add: Guangrao County, Dongying City, Shandong, P.R.China

Tel:+86-546-6660612

Fax:+86-546-6660279

Ph:+8613287307852

E-mail:info@aonuochina.cn

Spray Polyurea Elastic Coating

- Dec 27, 2018 -

(1).The A component is affected by moisture and must be protected from moisture contamination. Containers are factory sealed with an inert gas to prevent contamination. Keep all containers tightly closed during storage. For further storage after opening, containers must be purged with nitrogen gas or dry air and tightly sealed to protect from moisture contamination.

(2).Store drums and pails in a cold, dry and ventilated location between 15 ℃ and 40 ℃.

(3).Twelve months in sealed unopened containers.

(4).Keep away from fire and heat source.

(5).Keep away from rain and sun.


Related Industry Knowledge

Related Products

  • Chain Extender Diethyltoluenediamine
  • Polyurethane Insulation Coating
  • Overpass Wear Resistant And Anti Corrosive Spray Polyurea Coatings
  • Colorless Diethyl Toluene Diamine DETDA
  • Polyurea Anticorrosion For Loudspeaker
  • HT-7001-SF Spray Polyurea Elastomer Coating For Pipeline Use