Contact Us

Shandong Aonuo New Material Co,.Ltd

Add: Guangrao County, Dongying City, Shandong, P.R.China

Tel:+86-546-6660612

Fax:+86-546-6660279

Ph:+8613287307852

E-mail:info@aonuochina.cn

Spray Polyurea Protection Material

- Jan 10, 2019 -

Coating Property

Solid Content

100%

Viscosity (25℃)

≤1000mPa.s

Density (25℃)

A: 1.080-1.160 g/cm3 
R: 1.030-1.100 g/cm3

Volume Mixing Ratio

A:R = 1:1

Shelf Life

1 year

Curing Characteristics

Gelation Time

10-20 seconds

Touch Drying Time

60-120 seconds

Curing Time

6 hours

Maximum Strength

4 days

Coating Property*

Tensile Strength

22MPa

Elongation

40%

Tearing Strength

60KN/m

Hardness

60-70D

Flame Retardance

Self-distinguish in high fire

* It needs seven days for the polyurea coating to be completely aggregated and reach final strength.
Coating equipment status determines the property of coating.
A test sample is cured in a thermostat of 65-70℃ for 24 hours


Related Industry Knowledge

Related Products

  • Chain Extender For Spray Polyurea Elastomer
  • Acetocure MCDEA
  • Anticorrosive Coating
  • Brush Application Method Polyurea Coating
  • Polyurethane Elastomer Curing Agent
  • Polyures Anticorrosion Waterproof Protective Coating For Sewage Water Trestment Pool