Steps for Daily Shutdown

- Oct 17, 2018 -

Step1: shut down A, B and pipe heating power switch. Press oil pump STOP button.


Step2: check spray gun. When it is confirmed that there are no faults in spray gun and it could work normally again, the next step can be done. Otherwise, it is necessary to clean, maintain and overhaul spray gun;


Step3: turn off the total power switch on the instrument panel of the host machine;


Step4: shut down air source;


Step5: clean up the job site and confirm the step of shutdown has been finished. Check whether the remaining raw material quantity could satisfy the raw material necessary for startup again to be ready for the work again.


Related Industry Knowledge

Related Products

  • Chain Extender Equivalent To Lonza DETDA 80
  • Chemical Resistant And Waterproof Polyurea Coatings Sprayed On PU Foam
  • Polyurea Coating Spraying Machine
  • Polyurethane Elastomer Curing Crosslinking Agent
  • Building Use Polyurea Coating
  • Polyures Anticorrosion Waterproof Protective Coating For Sewage Water Trestment Pool